Airfoil components manfacturer

Back to Case Studies

The Requirement:

 

Due to an increased order book, our client needed extra storage space quickly to accommodate the storage of additional stock component parts. After surveying the site and gaining an overall understanding of the clients objectives HTS INDUSTRIAL  proposed one of its L-SERIES temporary warehouse buildings as the best solution to the requirement.


 

HTS INDUSTRIAL Solution:

 

We installed and supplied a 15.00m x 20.00m building with an eave height of 5.20m fitted with our energy efficient thermo roof system. The building was supplied with internal lighting, two personnel doors and two electric roller shutter door units. The whole project was completed in less than 6 weeks from date of order compared with over 32 weeks it would have taken to build traditionally.


 

 